PUBLISHEDOctober 30 2009
AUTHOR(S)ESMAP
Good Practices in City Energy Efficiency: Tianjin, China - Landfill Gas Capture for Electricity Generation

The city of Tianjin, the fifth largest city in China, has implemented a project to recover landfill gas (LFG), which was otherwise being released into the atmosphere, and burn pretreated LFG for electricity generation. The project was located at the Shuangkuo Landfill, one of five municipal waste landfills in Tianjin. The planned capacity of the project is 4.3 MW which is being installed in stages. The first generator, 1.03 MW, started operation in May 2008, currently utilizing 500-600 cubic meters of landfill gas. The electricity produced is being sold to the North China Power Grid under a long-term contract. Through the project, the city was able to use waste to generate revenues and gain local environmental benefits.

The project was initiated by the Tianjin Municipal Government, which has invested CNY46.7 million (US$6.9 million) in the project. The project has been implemented and is being operated by a specially created entity, the Tianjin Clean Energy and Environmental Engineering Co. Ltd. (TCEE). The project will obtain revenues from the sale of electricity which, over the project’s life, will amount to CNY245.2 million (US$36.2 million). The project has been registered as a CDM project under the Kyoto protocol and reached an agreement with the World Bank to purchase the certified emission credits (CERs) from the project.

The successful implementation of the project provides an excellent demonstration of the technology and the institutional mechanisms for LFG recovery and electricity generation, which can be applied to many other large Chinese cities.

Citation

ESMAP. 2009. Good Practices in City Energy Efficiency: Tianjin, China - Landfill Gas Capture for Electricity Generation. ESMAP Energy Efficient Cities Initiative. Washington, DC: World Bank.

Users also downloaded
At the time of independence, in 1991, Ukraine had a monolithic state-run power sector. Its main concern was to transform the sector into a more efficient and competitive system that can be consistent…
July 30 2021
power lines with blue skies background
This document offers guidelines for the preparation of feasibility studies for geothermal power projects in accordance with best industry practices.
July 22 2021
Preparing Feasibility Studies for the Financing of Geothermal Projects: An Overview of Best Practices
The reform package of Peru’s power sector delivered sizable efficiency and productivity gains, accruing to high quality regulation, industry restructuring, competition, and private management.…
May 31 2021
solar PVs in a rural setting in Peru
Reforms have been successful in many aspects such as the absence of demand rationing, improving efficiency and financial viability of the sector, attracting investment in power generation, and…
May 31 2021
rural neighborhood in Colombia with power lines crossing the street