Small Hydro Resource Mapping in Tanzania - Prefeasibility Study in Luegere

In 2013, ESMAP launched an initiative to support the efforts of countries to improve the knowledge of renewable energy (RE) resources, establish appropriate institutional framework for the development of RE and provide "free access" to geospatial resources and data. This initiative will also support the IRENA-GlobalAtlas program by improving data availability and quality, consulted through an interactive atlas. This "Renewable Energy Mapping: Small Hydro Tanzania" study, is part of a technical assistance project, ESMAP funded, being implemented by Africa Energy Practice 1 of the World Bank in Tanzania (the “Client”) which aims at supporting resource mapping and geospatial planning for small hydro. It is being undertaken in close coordination with the Rural Energy Agency (REA) of Tanzania, the World Bank’s primary Client country counterpart for this study. The prefeasibility study of the Luegere River is characterized by a good guaranteed low-flow that should be confirmed by hydrological monitoring of the River. The preliminary investigation of the surface geology concludes that from a geological point of view the site is favorable for the construction of the project as long as the appropriate mitigation measures are put in place. The site has no major problems of stability and leakages. Beyond the development of the Luegere hydroelectric project, it is strongly recommended that the Government of Tanzania further develop the existing hydrological monitoring network for its rivers with high hydropower potential in order to better understand the available water resources and thus promote the development of hydroelectric projects across the country. It is only in a context of reduced uncertainties through reliable, recent and long-term records (more than 20 years) that technical parameters and economic and financial analyzes of hydroelectric developments can be defined accurately, enabling optimization of their design and their flood control infrastructure (temporary and permanent).

Citation

World Bank. 2018. Small Hydro Resource Mapping in Tanzania: Prefeasibility Study: Luegere. Energy Sector Management Assistance Program. Washington, D.C.: World Bank Group. http://documents.worldbank.org/curated/en/967971518177978493/Small-hydro-resource-mapping-in-Tanzania-prefeasibility-study-Luegere

Users also downloaded
At the time of independence, in 1991, Ukraine had a monolithic state-run power sector. Its main concern was to transform the sector into a more efficient and competitive system that can be consistent…
July 30 2021
power lines with blue skies background
This document offers guidelines for the preparation of feasibility studies for geothermal power projects in accordance with best industry practices.
July 22 2021
Preparing Feasibility Studies for the Financing of Geothermal Projects: An Overview of Best Practices
The reform package of Peru’s power sector delivered sizable efficiency and productivity gains, accruing to high quality regulation, industry restructuring, competition, and private management.…
May 31 2021
solar PVs in a rural setting in Peru
Reforms have been successful in many aspects such as the absence of demand rationing, improving efficiency and financial viability of the sector, attracting investment in power generation, and…
May 31 2021
rural neighborhood in Colombia with power lines crossing the street